Course Overview
This course introduces the installation of drainage structures; road surfacing materials; and the inspection and quality assurance in forest road construction.
Prerequisite(s)
- 50% in RRET 3310
Credits
3.0
- Not offered this term
- This course is not offered this term. Notify me to receive email notifications when the course opens for registration next term.
Learning Outcomes
Upon successful completion, the student will be able to:
Module 6 - Drainage Works
- Describe the benefits of an effective road drainage network.
- Identify and explain the following ditching terms:
- Ditch blocks
- Ditch depths
- Methods of filter sediment
- Types of ditches (‘V', scraper, etc.)
- List the criteria used for the selection of various culvert materials.
- Describe culvert installation techniques.
- List the specifications used to order various types of culverts.
- Describe the techniques used to install culverts on steep slopes, (i.e., steep grades with ditches prone to plugging).
- Differentiate between stream culverts and cross drain culverts.
Module 7 - Road Surfacing Materials
- Describe the qualities of suitable gravel.
- Identify the terms used to define grain size distribution.
- Identify potential aggregate borrow areas.
- Describe when screening or crushing operations are appropriate.
- Describe compaction techniques using specialized equipment.
Module 8 - Revegetation Techniques
- Describe the purposes of revegetation.
- Describe the field conditions that require planned treatment to achieve timely revegetation.
- Seeding: direct dry, wet, hydro, helicopter
- Species: grass, legumes, shrubs, trees
- Special treatments: mulching, wattling, layering
- Erosion control matting
- Identify the appropriate method(s) and timing of treatment for given field conditions.
Module 9 - Miscellaneous Structures
- Describe the types and applications of retaining walls used in forest road construction.
- Describe the types and applications of retaining walls used in forest road construction.
- Describe the types and applications of other specialized structure used in forest road construction, including:
- Trash racks
- Cattleguards
- Guardrails
- Highway junctions
- Powerline crossings
- Railway crossings
- Pipeline crossings
Module 10 - Inspection and Quality Control
- Describe the critical phases in the construction process, as well as weather and seasonal criteria, that need special attention.
- Describe how the frequency of inspections is related to risk assessment.
- Describe the field indicators of good and poor forest road construction practices and procedures.
- Inspect road building practices and procedures for overall conformance with contract specifications and Ministry of Forests Road Standards.
- Complete evaluation checklists/reports to establish historical records for a given road construction project.
Effective as of Fall 2003
Programs and courses are subject to change without notice. Find out more about BCIT course cancellations.