July 24, 2019

August Long Weekend : Facilities Management Power Maintenance

In preparation for the Facilities Management Power Maintenance Event IT Services staff will be shutting down network equipment in affected buildings as follows:

From:  Saturday August 3, 2019 7:00 am through Monday August 5, 2019 10:00pm
Total duration of outage = 63 hours

All systems should be accessible from off campus or from non-impacted buildings.

All network connectivity will be unavailable from the impacted buildings

Reasons: 
  1. Facilities Maintenance BI-Annual High Voltage Maintenance - North Campus (https://loop.bcit.ca/docs/DOC-22516?sr=stream&ru=9631)
  2. Canada Way Project Shutdown - South Campus (https://loop.bcit.ca/docs/DOC-22517?sr=stream&ru=9631)
To see all Facilities announcements on The Loop, please visit http://loop.bcit.ca/groups/facilities-and-campus-development

1. Dates: August 3 - 5, 2019 | 7am - 10pm
Location: All North buildings - Burnaby Campus
(NE1, NE2, NE3, NE4, NE6, NE7, NE8, NE9, NE10, NE12, NE16, NE18, NE20, NE21, NE22, NE23, NE24, NE25, NE28, NW1, NW3, NW5, NW6)

Impacts of Interruption: Annual High Voltage Maintenance Shutdown. All buildings will be fully powered down periodically throughout the weekend as work progresses and accessible by authorized personnel only. Building standby generators will be running for critical equipment.

Facilities Contact: Joe Cosh, Manager - Electrical Trades | joe_cosh@bcit.ca


2. Dates: August 4, 2019 | 7am - 10pm
Location: All South buildings - Burnaby Campus
(SE1, SE2, SE4, SE6, SE8, SE9, SE10, SE12, SE14, SE16, SE30, SW1, SW2, SW3, SW5, SW9)

Impacts of Interruption: Canada Way Project Shutdown. All buildings will be fully powered down all day and accessible by authorized personnel only. Building standby generators will be running for critical equipment.

Facilities Contact: Joe Cosh, Manager - Electrical Trades | joe_cosh@bcit.ca , James Woo - Project Manager | jwoo@binnie.com