All documents below are in PDF format, which requires Adobe Acrobat Reader. Download the latest version of Adobe Acrobat Reader (free).
BCIT Staff And Students
- Equipment Identification Form [PDF]
- Move Instructions [PDF]
- Posting of Notices, Displays & Artwork [PDF]
- Facilities Services – Customer Service Expectations [PDF]
- Service Commitment – BCIT SwitchboSLA for Switchboard June 30 2020ard [PDF]
- Service Commitment – Burnaby Campus Facilities Service Desk [PDF]
- Service Commitment – Food Service Equipment [PDF]
Consultants
Technical Standards
These documents contain standards that are the minimum requirements for BCIT construction projects. The information in these documents is organized using the MasterFormat® and SectionFormat® systems. They are not specifications; they are intended to supplement the Consultant’s own documents. Do not use this information as a standalone specification.
Facilities and Campus Development (FCD) will consider requests for substitutions and other deviations from the standards. All such requests must be approved by the Director, Facilities Services and the Director, Project Services. Please speak with your FCD project manager or other FCD representative for assistance. These Technical Standards are currently under review.
- Division 00 – Procurement Requirements – Table of Contents [PDF]
- Division 01 – General Requirements [PDF]
- Division 03 – Concrete [PDF]
- Division 05 – Metals [PDF]
- Division 06 – Wood and Plastic (Interior Finishes) [PDF]
- Division 07 – Thermal & Moisture Protection (Building Envelope) [PDF]
- Division 08 – Openings [PDF]
- Division 09 – Finishes (Interior Finishes) [PDF]
- Division 10 – Specialties [PDF]
- Division 14 – Conveying Equipment [PDF]
- Division 21 – Fire [PDF]
- Division 22 – Plumbing [PDF]
- Division 23 – Heating, Ventilating & Air Conditioning [PDF]
- Division 25 – Integrated Automation [PDF]
- Division 26 – Electrical [PDF]
- Division 28 – Electronic Safety & Security [PDF]
- Division 32 – Exterior Improvements [PDF]
- Appendix – Janitorial Requirements [PDF]
Contractors
For the following information and access request forms
- Information to Contractors
- SSEM Pre-job Safety Checklist
- SSEM Access Request (keys, card access)
- SSEM Life Safety Shutdown Request
- SSEM Roof Access Request
- SSEM Confined Space Entry Permit Request
- SSEM High Voltage Vaults Request
- SSEM Utility Shutdown Request
- SSEM Contractor Sign Off
Click on the link below:
https://www.bcit.ca/safety-security/forms-documents/
For information on Asbestos Management Plan, click on the link below:
https://www.bcit.ca/safety-security/health-safety/asbestos-management/